Rydges South Bank

Rydges South Bank is one of the most popular function venues in Brisbane, and offers a number of ways to accommodate every event. From executive boardroom meetings to conferences, trade shows, conventions and gala events, the venue can welcome up to 1,000 guests. From 14 people in the executive boardroom to 600 people in the grand Podium rooms, the facilities cater to groups of any size.

Due to the weight of 250kg per panel, the 3 operable walls required a crane to deliver the panels to the podium level. Panel heights at 3.5 meters required mobile scaffolding to complete the install process.

Rydges and Base Architecture were specific on what they wanted their operable walls and slider to look like and function like, we were pleased to deliver on both.

Location

9 Glenelg Street, South Brisbane QLD

Sector

Hotel

Client

Built

Architect

Base Architecture

Specification

Rw50, fixed top/ fixed bottom seals, remote stack.

Finishes

Wallpaper selected and supplied from Rydges, Unifold conducted the panel face layup. Powdercoated frames and track from the Dulux range.

Let us help you design your Unifold product.
We are passionate about transforming workplaces by providing high-quality operable walls, folding doors, and glazed products that maximise floor space, and improve aesthetics.

More Projects

Insearch UTS
Insearch UTS

UTS College is the premium pathway provider to the University of Technology Sydney, Australia’s number one Young University. Insearch Limited (UTS College) is a controlled entity of the University of Technology Sydney (UTS), and a registered private higher education...

99 Bikes
99 Bikes

The team at 99 Bikes were clear on what they wanted, it had to be the Soundguard 34 Accordion Door to provide suitable sound reduction between meeting rooms and a quick open and close set up. Like their bikes, they move fast.3 Light Street, Fortitude Valley...

Park Ridge State High School
Park Ridge State High School

The project involves the design & construction of a new single storey Administration Building + refurbishment of the existing Administration Building + associated site landscaping works. The approximate overall budget for the construction is $4m - $5m.3776 Mount...